Tracker · Pre-application

REPLOY Power, Inc.

The U.S. Nuclear Regulatory Commission is currently engaged in pre-application activities with REPLOY Power regarding future construction permit, operating license, manufacturing license, and standard design approval applications.

Who
REPLOY Power, Inc.
Design
Not stated
Reactor type
Light Water Reactors
Status
Active on the NRC index
What
Pre-application activities associated with future construction permit, operating license, manufacturing license, and standard design approval applications
When
July 2024 to Present
Site
Not stated on the NRC page in this snapshot.
NRC page reviewed
Tuesday, September 15, 2026

Dockets

Status timeline

Dates are printed as the NRC page prints them, including the actual (A) or target (T) mark.

The NRC page in this snapshot does not list a milestone table.

NRC activity table

ProductTypeReferenceStatus
Submersible Power System Prototype Unit IntroductionWhite PaperML25280A244Feedback providedML26008A127
Environmental Impact Report Approach for SPS Units, Revision 0White PaperML25280A239Feedback providedML26007A132
REPLOY Power Quality Assurance Program Development, Revision 0White PaperML25209A135Feedback providedML25240A896
REPLOY Power Response to the NRC Regulatory Issue Summary for FY 2026-2028ResponseML25176A056No Review Requested
REPLOY Power Regulatory Engagement PlanRegulatory Engagement PlanML24270A052No Review Requested

Related Federal Register notices

Included when a notice shares a docket printed on the NRC page, or when the notice title repeats the project or design name. Other NRC notices are left out.

No in-scope Federal Register notice is linked to this project.